Getting an Austin House Ready for Window Day

How much of the house has to be cleared before window day?

The crew needs a clear path from the driveway to every opening, and a clear working strip of about an arm's length inside each room. Beds, couches and bookcases that sit against a window wall get pulled into the middle of the room. Curtains and blinds come down the day before, not the morning of, because an installer who has to unhook a rod at eight o'clock has already lost a half hour. Pictures on the same wall come down too, since vibration from removing a frame travels along drywall.

Outside, the first thing a crew looks for is where the old sash will land. A flower bed under a window, a patio set, a grill or a row of potted herbs all get moved before the first frame comes out. In a small yard in Bouldin Creek or Travis Heights, that can mean shifting everything to the back fence for a day.

Will the house be open to the weather while the work happens?

Only one opening at a time, and only for as long as the swap takes. A standard double hung replacement into an existing frame takes a crew a short while per opening, and the new unit is closed, sealed and locked before the next old one comes out. Full frame jobs, where the trim and the old frame are removed, leave a bigger hole and take longer. Those are the jobs where the crew lead watches the sky, because a spring storm that builds over the Texas Hill Country can arrive over Austin faster than a forecast suggests.

For anything that has to stay open overnight, the crew tarps the opening from the outside, tapes the edges and leaves a note on the sheet so the next morning starts there. A tarp is a temporary measure, and a good crew treats it as a failure of planning rather than a normal part of the job.

Is the work loud and dusty?

Pulling a wood window out of a plaster or drywall opening makes noise and some dust, and a house with older paint needs more care than a newer one. Crews lay drop cloths inside each room and tape plastic across doorways to the rest of the house. A vacuum with a filter runs at the end of every opening, not at the end of the day. Windows in a Mueller house, built in recent decades, usually come out with less dust than an old bungalow in Hyde Park, where decades of paint sit in the joints.

Noise comes in short bursts: a pry bar, a saw cut through a sealant line, a nail gun when new trim goes up. A household that works from home can plan for the loudest part of the morning, and a crew lead will usually say which rooms go first so a quiet room stays quiet until the afternoon.

Do pets and kids need to be somewhere else?

An open wall, tools, glass and strangers moving through the house is a bad mix for a dog that bolts and a toddler that follows noise. Most households shut pets in a room that is not being worked on or send them out for the day. Small children belong on the far side of the house or at a relative's place. The crew lead will tell the owner which rooms are being opened in which order, and a room that is finished can become the safe room for the rest of the day.

What does the crew need access to besides the windows?

A short list: an outlet for tools, a hose bib for cleanup, a place to stage new units, and a parking spot near the front. New units arrive in boxes or on a rack, and they stay upright and out of the sun until they go in. Glass left lying flat in an Austin driveway in July can heat unevenly and get scratched when someone sets a box on it. A shaded spot under a carport or along a north wall works, and a garage works better.

The crew also needs to reach the exterior wall at every opening. A fence line that sits a foot from the wall, a shrub grown against the stucco or an air conditioning condenser tucked under a window all get dealt with ahead of time. Trimming a hedge the day before is much simpler than asking the crew to work around it.

What happens if the old frame has rot or damage?

Rot found behind trim is the one surprise that comes up on most older houses. When the old window comes out and the sill is soft, the crew stops and shows the owner. The options are to repair the sill and framing now, which adds time to that opening, or to install the unit with a note and plan the repair separately. A written scope that already has a line for sill and jamb repair keeps this conversation short, which is one reason the scope is read so carefully before signing.

Houses near the Colorado River and Lady Bird Lake sometimes carry more moisture damage than houses on higher ground, and houses on clay soil that shifts near the Balcones Fault can have frames that no longer sit square. Neither is a reason to panic. Both are reasons to leave a little slack in the schedule.

How long before the house is back to normal?

Most of the mess goes the same day. The dust is vacuumed, old units are loaded out, and the interior trim is either finished or marked for a return visit. Paint and caulk touch ups may need a second visit because caulk has to skin over before it can be painted, and that takes a day or more depending on the weather. A cold snap slows it, and a hot afternoon speeds it up.

Disposal of old windows happens on the crew's schedule, not the owner's. Glass and frames go into lined containers, and the yard gets swept for fragments and screws. At the final walkthrough the crew lead and the owner go through the house together, test every sash and lock, and build the punch list. Anything on the punch list gets a date, and the job is not closed until each line is done.

Should anyone be home during the work?

Someone should be there at the start and at the end. The start is for the crew lead to confirm the opening list against the measurement sheet and to point out anything the sheet missed. The end is for the walkthrough. In between, the owner can work or leave, as long as the crew can reach the house and has a phone number for questions. Questions come up: a window that opens the wrong way, a unit that arrived with a cracked pane, a trim detail that looks different on the wall than it did on paper.

A small number of jobs also need a decision in the middle, such as whether to keep a decorative stool or replace it. Those decisions go faster when the owner is reachable. If a historic review or neighbourhood association approved a specific detail, the crew lead will want to confirm that detail on site before the final trim goes up, which is another reason to be reachable.

What is the single best preparation?

Clear the walls, clear the yard, and read the scope once more the night before.